Early Baseboard Construction
31st December 2006

The first three boards that will house the permanant way yard were adapted from an earlier aborted layout and so need to be adapted for Quaker Lane.

<-- Index | Showing 1-5 of 5 pictures | Index -->
A normal club night - Not much going on apart from swapping phone rings!!!
A normal club night - Not much going on apart from swapping phone rings!!!
Board_Construction_1.jpg
The first three boards with track sub base in place
The first three boards with track sub base in place
Board_Construction_2.jpg
The sub base about to be put into position. The 9mm ply gives a solid base and enables the track to be raised above ground level.
The sub base about to be put into position. The 9mm ply gives a solid base and enables the track to be raised above ground level.
Board_Construction_3.jpg
Baseboards in situ in the clubrooms being test fitted
Baseboards in situ in the clubrooms being test fitted
P1010012.jpg
The loading bay is now installed with the brickwork, edging and surface in place. Just a bit more weathering to be done!
The loading bay is now installed with the brickwork, edging and surface in place. Just a bit more weathering to be done!
__19-02-07_009.jpg