Permanent Way
1st January 2007

Images showing the construction of the permanent Way on the Layout. Built to 16.5mm gauge 00 using C&L components we aim to give the illusion of a finescale layout with both wooden ond concrete sleering.

<-- Index | Showing 1-4 of 4 pictures | Index -->
The Yards main throat points under construction.
The Yards main throat points under construction.
P1010095.jpg
The almost completed Yard
The almost completed Yard
__5-01-07_012.jpg
The almost completed Yard
The almost completed Yard
__5-01-07_019.jpg
The main cross over points in the yard
The main cross over points in the yard
__5-01-07_023.jpg